Appendix 2



1.

PROPOSED PROGRAMME FOR MINING OPERATIONS



Accomponying Applicotion for Lorge Scole Mining Licence (LML)

Over

Areo under Prospecting Licence No. 19622-HGLPL ot Mwochilingo, Shontumbu

Areo. Kofue District.

By



Lu Hong Stone Mining



Compony Limited



Plol No.2440, Chipwenupwenu Rood, Mokeni,



a



P.O. Box 33612,

TUSAKA



Lorge Scole Mining Licence (lML) Applicollon, Mryochillngo / Shontumbu Areq, Kotue Dlllricl. l,u Hqng Slone Mining

Compdny limited, Ploi N0.2440. Chlpwenupwenu nood, Mokeni. P.O.Box 336t2, Lusoko-



12



T



t



2.0 PROPOSED PROGRAMME OT OPERATIONS

2.1



T



lnhoduclion



Lu Hong Stone Mining Compony Limited is o Zombion regislered compony under the

Compony Regislrotion Act. The compony hos o dedicoted leom of Director ond

Shoreholders wilh vosl experience in quorry operotions. Through iis sister componies in

Chino, Lu Hong Stone Mining Compony Limiied is octively involved in consiruction ond

civil engineering works with o dedicoted ond experienced teom of directors. Recently,

Lu Hong Slone Mining Compony Limiled wos oworded o number of conslruclion ond

civil works conlrocts in Zombio, o number of which ore within Lusoko. To meel ihe

conlroctuol obligotions, the compony would require lorge volumes of quorry products.



t

T



I

1.



It is from this bockground thot ihe compony hereln opplies for o Lorge Scole Mining

Licence over the oreo covered by its Prospecting Licence No. 19622-HQ-LPL.

Upon groni of Lorge Scole Mining Licence, Lu Hong Sione Mining Compony Limiled

intend to slort quorrying operolions ot the identified dolomitic / Limestone hill within the

lenement. The compony will invest on initiol sum of more thon USD 5.5 mllllon on Copex,

infrostructure ond operotions over on initiol 5 yeor period. The quorry operolions will run

on minimol mechonizotion, whilst utilizing locolly ovoiloble skilled ond unskilled humon

resource os much os proclicolly possible. As o motter of policy, ond os porl of iis

corporole sociol responsibiliiy, Lu Hong Stone Mining Compony Limited will be

committed to conkibuting positively to lhe locol ond regionol economic growth

through the quorrying project ot Mwochilingo / Shontumbu Areo in Kofue Diskicl.

Wilh increosing demond on quorry oggregoles, the compony plons to run the quorry

throughout the yeor while moinloining sufficient stock piles to cover up for lhe plonned

plont mointenonce period.



ln os much os procticolly possible, the compony will remoin commilted io



the



Environmentol Monogement Plon (EMP) herein oulline.



a



2.2 SUMMARY OF PROGRAMME OF OPERAIION



Period



No.

2.2.1



ActlvltyDescdpllon

Prospectingworks



Slorl



End



Esllmoled Commenh

Cost (USD)

20.000



Work compleled for

PHASE I Quorrying,



work for PHASE ll lo be

commenced os soon

os LML is gronted.



2.2.2



Mobilisotion



r



2,000



Mobilisotion lor

Quorrying operolions



commenced during

Prospecling.



torge Scole Minlng Ucence (LMt) Appllcotlon, Mwochlllngo / Shonlumbu Areo, Kqlue Dirlrict. [u Hong Slone Mlnlng

Compony Llmlled, Plot No.2440, Chipwenupwenu Rood, Mokeni, P.O.Box 33612, l,uroko-



13



T



T



I

t

I



2.2.3



Procuremenl of Plonl &

Equipment



5,000



Commenced during

Prospecting. Aboul

90% Plont ond

Equipmenl procured



2.2.4



Consulloiive meetings

wilh slokeholders



3,500



Meeting conducted

with stokeholders;

Ministry of Mines,

Energy & Woter

Developmenl, ZEMA,

Kofue Dislrict Council,

Minislry of Lond,

Chief's Representotive,

Locol Community.



2.2.5



ldenlificotion of effecled



2,O@



No household wos



T



h



olfecled-



households for possible



relocotion.

2.2.6



2.2.7



Survey of tenement ond

pegging



2,500



Environmentol Project Brief

(EPB); Generol mining



3.000



for Guorrying

operotion wos

prepored by

consullonl ond

submitled lo ZEMA.

Decision Lelter

owoited.



Costing of Crusher

loundotion ond crushing

plont ossembly, Cleoring

of slock piling oreo &

Conslruclion of slqb.



150.000



Crusher foundotion



Construclion ond civil

works; Office block.

Workshop & Wosh boy.

Storerooms, Ablufion

block, FirstAid Clinic,

Weigh Bridge, Fuel Slotion

& Gen-Set room, Securily



350,0m



conied oui; pegging

cerlificote issued.



oreo



2.2.8



o

2.2.?



Survey of lenement



EPB



conslructed; Crushing

plont being

ossembled. All

Crushing Plont

components

delievered.

Construction of oll civil

works in progress.



fence & Gote.



2.2.10 Over Burden Over Burden

Removol



Nol required for Phose

| ; Quorrying the

identified dolomilic /



lorge Scole Mlnlng Llcence ([ML) Applicotion, Mwochilingo / Shoniumbu Areo, Kolue oiiklct. !u Hqng Stone Minlng

Compony Llmited, Plol No.24{0, Chipwenupwenu Rood, Mokenl, P.O.Box 33612, Luloko.



t4



T



I

I

I

T



I



l.

t

T



I

I

T



f



Limeslone hill



2.2.11 Quorrying



&



Crushing



operoiions



As



per



Annex



Open Pil mining

expecled ot the

identified pit locolion.



2.3 Esllmoles of Expendllures



Toble 2.3 (1) shows summory of estimoted expenditure over the initiol 5 Yeor

period. Refer olso to Annexure 2.3 l2l tor detoils of expenditure over 5 Yeor

period.

Toble 2.3 (l): Summory of Estimoted Expenditure for initiol 5 Yeor Period.

No.



I

2

3

4

5

6

7

8

9

l0



Descrlplion



USD



Solories



2.860.000



52%



Consumobles, Services & Others



1,760,000



32%



22,@O



0.4%



Tools



110.000



Sofety ottire ond Equipment



2%



33.000



0.6%



4,785,000



87%



Plonl & Equipment



605.000



11%



Civil works & lnfrostructure



110,000



2%



Sub-totol Copex



715,ff)O



Stotutory Services ond Consultoncy



Sub-totolOperolionol



lotol Expendllure Proleclion



13%



s.500,000



2.4Quorrylng Operotlons

During Phose l, it is plonned thot quorry production will concentrote on lerrocing

of the idenlified dolomitic / Limestone hill. The operotion would moinly use the

CAT hydroulic hummer to breok the dolomite. ln some instonces, drilling with o

l45mm Q holes. The broken

ZGYX 430 Drill Rig ond lighi blosting on 9Omm



-



Lorge Scole Mlnlng



licence ([Mt) Applicotion, Mwochllingo / Shohlumbu Areo, Kolue Dirlricl. Lu Hong Stone Mining

compony Umiled. Plot N0.2440, Chipwenupwenu Roqd, Mok6nl, P.O.Box 33612, tt soko.



15



I

T



moteriol would then be looded onlo tipper trucks using o CAT 320D2 Excovotor.

The Iipper trucks would then tronsport the moteriol to the Primory Crusher. Drill

Rig, Hydroulic Rock Breoker, Excovotor ond Tipper trucks hove been procured

for the plonned Quorry operotions.



t

I



I

I



LJ



A

r

I



l.



f



t



\

t-



IL



----<



,



I

ll



t



..?



tr

f-



-t



Q,



aa

t

/.1



a



ry



a



I



J



.Cf^,

,



I



\-



Figure 2.4(l ): showing sorne of lhe procured equipmenl for the Quorry.



Specificotion of lhe procured mojor Quorry Plonl ond Equipment ore indicoted

in Toble 2.4(2).

I

i



Lorge Scqle Mining Llcence (LML) Appllcollon. Mvrqchilingo / Shontumbu Areo. Kofue Distrlcl. Lu Hong Stone Mlnlng

Compony Limiled, Plot No.2440, Chipwenupwenu Rood, Mokeni, P.O.Box 33612, Lu5oko.



15



T



t

I

I

I

I



l.



Qty



Equlpmenl Delcriplion

Drill Rig



I



Type



/ Speclficolion3



-



90mm



-



'l45mm,



-



Boom height

Mox.

drill

lenglh

3Om,

Pressure

.200mm,

- l0 -25k9/cm,

Pressure Amouni - lG20m3/min



ZGYX 430 Type, Drill Q

I



Hydroulic Breoker



I

'I



Excovoior



I



CAT 320D2 Excovotor



Dump Truck



7



Type



Compressor (Drill Rig)



Model G 185 SDY-17. Size



-



,



l90omm x 'l630mm x 5l0.5mm



CAT 320D Hydroulic Rock breoker



-



Dong Feng Liu Zhou



Toble 2.4 (2): Quorry Equipment Specificotions



T

2.5 Crushing Operollons



T



I

I

I



f



A fixed mobile crushing plont consisting of



Primory crusher (E Shi Crusher),

Secondory Crusher, multiple vibroting screens ond dischorge conveyors will be

incorporoted in the crushing plont. Quorry moteriol of obout 900mm - l200mm

would be off looded on the rump directly into the feeder, which will feed into

the Primory Jow Crusher (PJC). From lhe PJC, the crushed moteriol will be

conveyed vio o conveyor belt into o Secondory Jow Crusher (SJC) where the

four (4) different quony products would be produced i.e. -6mm Quorry dust, G

5mm, 5.1-lOmm, ond 10.1-25mm will then be conveyed using three conveyor

belts to storoge oreqs owoiting collection by clients. The oversize rocks in the

vibroting screen will be routed to lhe impoct crusher ond sent bock lo the Jow

Crusher for further crushing.



All components of the Crushing Plont (CP) hove been procured reodily

ovoiloble.

Specificotions lor the procured Crusher ore indicoted in Figure 2.5 (1).



0

lorge Scole Mlning Llcence (IML) Applicotion, Mwqchilingo / Shonlumbu Areo, l(ofue Dist.ict.



Lu



Hong Stone Mlnlng



Compqny Limifed, Plol I'1o.2440, Chipvrehupwenu Rood, Mokeni, P.O.Box 33612, l,usoko-



L7



T



T



I

t



ri



il



It



rtltf,tllmm



r rlh



t



l.



I



fil-{!



ersrf

ure



2. 5



1 1)



PE



?00mm x



Copocity l&Z*rn



l2ffimm



lbr.



lntoke



900nmx l200ltm



Ovttoka



l30rrrn - 230mm



Mox



-8E393088



Fig



inioko



Power



8@rrvn

l85kW



: Prirnory Crusher Specificolions.



The Crushing Plont Quony Aggregotes production would be plonned in quotos

os indicoted in Toble 2.5 (2) below:Toble 2.5 (2): Quorry Products Quoto



I

I



Producl



Quolo



Dust

9.5mm Aggregote

l3.2mm Aggregote

l9mm Aggregole

- 6mm Quorry



I



f



tE:05?l



Spectrcoliom



Typa



E

!t

ttlfisEffi*tldr

rm[tlmm 1t*ilI'imrn

I

ffiErEImm tPt,rEffi



I

t

I



fiilffi8ilr



t



2.6



l57o

18%

23%



45%



Stock piles ond Wosle Rock Dumps (WRDS)



The project will mointoin stone oggregole moteriol on three (3) stock piles bosed

on oggregole sizes thoi is G5 mm, 5.1-l0mm, ond l0.l-25mm ot the conveyor

toil-end. The slock piles will oct os storoge ond collection points.



Though no subsiontiol Over Burden (OB), operotion will be done ot the moin

open pit. o WRD will be mointoined. Both stock piles ond WRDs will be locoted

on the windword side so os to check on dust effeci on both personnel ond

generol work environment.

These stockpiles ond WRDS operoted

Environmentol Monogement Plon.



ond moinloined in odherence to the



torge Scole Mining Licence (LML) Applicdlion, Mwochilinga / Shqntumbu Areo, KoIue Dlslrlcl. Lu Hong Slone Mining

Compony Limifed, Plot No.2440, Chlpwenupwenu Roqd, Mqkenl, P,O.Bor 336l2, tuioko,



18



t

T



I

T



I

I



h

I

T

T



I

I



f



2.7 Produclion Eslimoles



The Quorry / Open Pit operotions would effectively run on o I I month

operotionol yeor, ond 20 working doys per month to ollow for onnuol

mointenonce ond olso ovoid period of moximum wei condilions during the

roiny seoson. However, crushing would be ollowed for period of l2 months ond

20 working doys. A 250tph copocity Jow Crushing Plont would be incorporoled

in quorrying operotions for production of vorious sizes of quorry oggregotes.



2.7.1 Plonned role of mlnerol ore recovery

ln the initiol I0 yeor period, lhe project would operote the ideniified limestone

resource ot the locotion ol ihe dolomitic / limestone hill with initiol eslimoted

recoveroble reseryes of opproximotely 2l.Tmllllon tonnes of extroction rote of

l,600tpd building up to 2,000tpd by the 7tn yeor while building up o steody slock

pile buffer for lhe Crushing Plonl ot initiol 6,800tonnes ot end of lst Yeor building

up io 80,000 tonnes by the 7th Yeor. Quorry production porometers for ihe iniiiol

ten ( I 0) yeor period ore os shown in Toble 2.1 3.1 ( I ). Two (2) yeor window

production schedules would be produced regulorly to guide quorry production.

With moximum extroction rote of 440,0@ tonnes per yeor, mine life is estimoled

ot 49 Yeors for Phqse I Quonying operotions. Refer to Toble 2.7.,1 (l ) tor deloils on

summory for l0 yeor plonned extroction roies.

Toble 2.7.1 (l ): llYr Exlroclion Rotes



Yeorl

NoWD/Monlh



Operotionol moths

NoWD per Yeor



Tonnes per doy (tpd)



Tonnes per month (tpm)



Tonnes per yeor (tpy)



-3

20

ll

220



1,600



32,000



Yeor4-6



Yeor 7 -



l0



20



20



]t



ll



220



220



1,800



2,000



36,000



40,000



352,000 396,000



'mo.mo



Lorge Scole Mining Licence (LMt) Applicolion, Mwochilingo / Shonlumbu Areo, (ofue Dislrict. Lu Hqng Stone Mining

Compony Limited. Plol No.2440. Chipwenupwenu Rood. Mokeni P.O.Box 33612. Lusoko.



19



I

T



I

I



I

I



h

I

T



t

I

t



f



2.7.2 Crushing Plonl producllon

Lu Hong Stone Mining Compony Limited will incorporote o 250tpd Crusher plont

in its operotions ot the site. The Crushing plonl would however run ol 98%

copocity building up to 100% copocity by the 7th yeor.

The crushing plont is plonned io quorry oggregotes os per current morkel

demond ond considering the ever increosing demond resulting from increosed

construclion octivities. Plonned onnuol production indicoted in Toble 2.7.2 (1)

Toble 2.7.2111: Plonned Quony Aggregotes Production ond Stock piles



Producl Descrlpllon



Annuol Producllon (Tonnes)



3

51,840



Yeor I lo



- 6mm



Quony



Dust

9.Smm Aggregote

13.2mm Aggregole



l9mm Aggregote



62,208

79 ,488

155,520



6

52,920



Yeor4lo



63,504

8t ,t 44

158,760



Yeor



7lo l0



54.000

64.800



82,800

162,000



Lu Hong Stone Mining Compony Limited olso plons in Phose ll



of the project



improve further on volue oddition ond including lime produclion in their

produclion line.

2.SPlonned wosle rock volumes per monlh ond dlsposol mechonlsms

The project would run on moderote mechonised open pit mining method which

would olso ollow higher levels of selective mining so os to reduce stripping rotios,

ond thus highly reduce omount of woste hondling. However, o suitoble woste

dumping site hos been included in the mine loy-oul in complionce with the

Environmentol Acl, ond Mining Regulotions.



It is however onticipoted thot not much woste would be generoted,



os



quonying would be done on o hill which olmost 100% dolomitic/limestone

moleriol. Most of the woste generoted would find use on the rood rehobilitotion

works, ond other works within the locol community, os pori of Corporole Sociol

Responsibility (CSR).



Lorge Scole Mining Llcence (LMt) Applicotion, Mwqchllingo / Shontumbu A.eq. (olue Dlstricl. lu Hong Stone Minlng

Compony Llmlted, Flol No.2440, Chipwenupwenu Rood, Mokenl. P.O.Box 33612, Lu50ko-



20



T



t

I

I



2.9



lnlroslruclureDevelopmenl



Aboul USD 150,000 is plonned for infrostruclurol development ot lhe quorry sile,

which would include omong others os shown in Toble 2.9 (l):Toble 2.9(l ): lnfrostructure Developmenl



I



S/No.



T



2



Workshops



tr



3



Conteen



I



4



Ablution blocks



5



Wore houses



T



6



Access Roods



t

I



7



Crushing Plont foundolion structure



8



Woter Bore hole & woter supply syslem



9



Electricity power supply system

tronsformer



r0



Explosive mogolnes



II



Weigh bridge



t2



Fuel Storoge tonks (U/G)



Volue (USD)



llem Descrlpllon

Administrolion Office block



T



f

A



r



50,000



/



km occess rood hos been constructed. The rood hos olso greotly

benefiled the locol communily with eosy occess, ond improved



!



I



tronsportotion. Construction of office block wiih oll focilities, ond o number of

workers quorter is under woy within ihe lenemenl oreo, which portion is olso

under title deed.



Lorge Scole Mlnlng Licence (l.ML) Appllcotlon, Mwdchilingq / Shonlumbu Areq, Kolue Dlslrlcl, !u Hong Slone Mlning

Compony limited, Plot No.2il40, Chipwenupwenu Rood, Mqkenl. P.O.Box 33612, tuioko-



2L



Block uoder conslruclion



b*

)



,l



a--



'iJ



h

.t



T



Rood



I

t



I

T



f



I



I



Figure 2.9(2): Showing lhe con



ccess



\



under construclion.



2,10 Elechlclty poYver supply



The proposed Quorry site lies wilhin ZESCO electricity power grid, with the

neorest Quorry within I km olreody connected. About USD 35,000 is plonned for

construciion of sub-stoiion ond power supply line. The existing ZESCO power

supply line runs olong the moin occess rood ond connects to the neorby

Quorries.



Lorge Scol€ Mlnlng Llcence (LML) Applicotion. Mwqchilingo / Shontufibu Areo, xofue Dl.lrlct. Lu Hong Stone Mininq

Compony tlmited, Plol No.2440. Chipwenupwenu Rood, Mokeni. P.O.Box 33612, Lusoko.



22



L.



:L.



h

I



r



T



.--.

t-



Figure 2.10(l): ZESCO Power Supply line olong lhe moin occess rood to the proposed Quorry site.



T



2.11 Copitol Plonl ond Equlpmenl



I



The compony hos olreody procured copitol plont ond equipment. About 90% of

the Plont ond Equipmenl hos olreody londed ond is reodily ovoiloble. Very few

porlions of Plont & Equipmenl ore in tronsit. Refer to Toble 2.1 I (l ) for detoils.

Toble 2.11 (l): Procured Plont ond Equipment



T



f



Item

No.



atv



Descdpllon



Unlt Pdce

(zMr()



Volue



Volue



(USD) Noles



(zI1^x)



I



Primory Crusher



I



180,000 I 80.000



28.800 Reodily ovoiloble



2



Secondory

Crusher



I



175,m0 175,000



28,000 Reodily ovoiloble



3



Weigh Bridge



4



Conveyor



5



Gen-Set

Excovotor (CAT



6



320D21



7



F.E.L (Liu



Lorge Scole Mlnlng



Belting



6



2



Gong



2



80,000 80,000



12,800 Avoiloble



75,000 450,000



72,000 Avoiloble



325,000 325,000



52,000 Avoiloble



750,000



r,500,000



240,000



I



56,250



llcence ([ML) Appllcotlon, Mrvochillngo / Shonlumbu Areo, Korue Dlslrlcl.



1 Unil in



Lu



tronsit



Unil in tronsit



Hong Slone Mlnlng



Compqny timited, Plot No.2440, Chipwenupwenu Roqd. Mokeni, P.O.Box 33512, Lusoko.



23



zLsocN)

I



8



Hydroulic Rock

Breoker (CAT 329)

Air Compressor



9



(Utility)



r



937,500 937,500



h



150,000 Reodily ovoiloble



mounted)

Compressor - Drill



190,000 190,000



30,400 Reodily ovoiloble

28,800 Reodily ovoiloble



Rig



I



180,000 180.000



12



Tipper Trucks



7



125,000 875,000 I 40,000



l3



F.E.L (Smoll)



I



14



Totol Volue



ll

I



r8,000



185,000 185.000 29,600 Reodily ovoiloble



Drill Rig (Crowler



l0



r2,500



27



,5OO 27,5O0

5.217.500



Reodily ovoiloble



4,400 Reodily ovoiloble



83'1.800



T



!

I

I

I



f



2.12 MonpowerRequlremenl

The Project would initiolly engoge obout 80 direct employment ploces for both

skilled ond unskilled monpower, of which oboul 80% would be drown mostly

from the locol communily in Mwqchilingo / Shontumbu Areo. However, o teom

of Chinese expolriotes would be engoged ol initiol stoge, for instollotion of plont

ond equipmenl, ond to offer OnJhe-job troining to the locql Zombion



employees. On the job troining would be highly be encouroged for effective

ond oppropriote skills tronsfer. Full monpower requirement is indicoted in Toble

2.12 (ll below:I oble 2.12 (l ): Proposed Monpower requiremeni

s/No.



DESIGNATION



r.t2r



Quory ilonogcr's OfEce



t.l2.l.



t



I .'t2.1



.2



1.12.1.3

I .12.1



.4



1.12.1.5



Quorry Monoger (QM)

Secretory



NUII'IBER



-



Mining Engineer



I

I



Driver



Office Orderly

Security Guords



5



I

I



Lorge Scole Mlnlng Licence (l,Ml) Applicotlon, Mwochillngo / Shontumbu Areo. Kolue Dllt.ict. Lu Hong Slone Mining

Compony Llmlfed, Plot No,2440, Chipwenupwenu Rood, Mqkeni. P.O.8ox 33612. Lusoko.



24



T



I

t

I

T



t

|.



I

t



I



ll



1.t2.r.6



Sub-Iotol



1.12.2



Englneering Secllon



1.t2.2.1



Moinlenonce Engineer



I



.12.2.2



Mointenonce Foremon



1



.t2.2.3



Quorry Mointenonce Technicion



2



1.t2.2.4



Crushing Plonl Moinlenonce Technicion



2



r.12.2.5



Ulility vehicle Drivers



2



1.12.2-6



Sub-Tolol



8



1.r2.3



Accounls,



r.12.3.r



Accounionl



1



.12.3.2



t.12.3.3

1



.12.3.4



Supplles & Humon Resource! Seclion

I



Accounts Assislonl

Supplies Olficer

Stores Clerk



r.12.3.5



Administroiive Off icer (HR)



T



r.12.3.5



Firsl-Aid Officer



I



1.t2.3.6



Cleoners



1,1L3.7



Sub-Iolol



1.12.1



Crushing Plonl



1.12.4.1



Crusher Plont Supervisor



,



l



/ Generol workers



4



t0



1



.t2.4.2



Plont Fitlers



2



1



.12.4.3



welder



2



Heovy Duty Equipment Operolors



t2



Electricion



J



| .12.1.1



t2.4.5



I



.



|



.t2.4.6



Bin/Weigh Bridge Operotor



2



I



.12.4.7



Crusher Operolors



4



Lorge Scqle Mining Licence (LMt) Applicolion, Mwochllingo / Shonlumbu A,eo, Kolue Oistricl. tu Hong Stone Mlning

Compony Limited, Plot No.2440, Chipveenupwenu Rood, Mokeni, P.O.Box 33612, Lusoko.

t



25



1



1.12.4.9



sub-Iolol



1.12.5



Quorry sectlon



1.12.5.'l



Quorry supervisor



I



/



Loshers



t0

36



.12.5.2



Blosters



2



L i 2.5.3



Drillers



2



1.12.5.4



Heovy Equipment Operolors



3



t.12.5.5



Compressor



1



It



Crusher Atlendonts



.12.,1.8



/ woter pump Atlendonts



2



Open Pit Drilling & Looder Assislonls (Loshers)



5



1.12.5.7



Sub-Iolol



t5



1.12.6



GRAND IOTAI.



80



2.13



Sofety & Heolthy



I



.



r



2.5.6



T



t

t

T



f



The Sofety ond Heolth of the workforce, sunounding communities ond the

environmenl is considered lo being one of the keys to success in this project. As

such o full Sofety ond Heolth progromme will be estoblished in order to produce

the required oulcome. This will be in line with currenl mine sofety ond heolth

proctices, ond will include providing odequote medicol focilities to coter for

emergencies whilst providing odequote occess for oll other medicol needs. ln

this regord. the project will coordinote odequolely, ond porlicipote in oll

government heolth progrommes concerning the locol community with the

responsible government line deportments in Mwochilingo / Shontumbu Areo.

First-Aid focility will



be provided ot the quorrying site, while oll workers will be



equipped with bosic First-Aid



skills.



The project will olso creote oworeness on HlViAlDS, prevention, ond HBC omong

the employees ond thek fomilies in colloborotions with the District Heolth



Monogement Teom (DHMT).



Lorge Scole Minlng Llceoce



t



([Mt] Appllcotlon, Mwochillngo / Shontumbu Areo, Kolue Disiricl.



Lu Hong Slone Mining

Compony Limited, Plot No.2440, Chlpwenupwenu Rood, Mokeni. P.O.Box 33612, Lusokd.



25



T



I

I

T

T



I



b

T



t



I



2.14 Environmenlol lmpocl Sludy



At Prospecting stoge, on Environmentol Project Brief [EPB) wos instiluted, ond

submitted to Zombio Environmenlol Monogement Agency (ZEMA) on 3ro

December,20l4. The submitted EPB wos considered by ZEMA on 28th Jonuory,

20]5, ond subsequently Decision letter wos issued doted 30rh Jonuory, 2015.

During ihe tenure of the Lorge Scole Mining Licence herein opplied for, o full

Environmentol lmpoct Assessment would be corried out during the first yeor of

the operotions in colloborotion with ZEMA.

2.15 Source of ftnonce

The quorrying operotions will be finonced enllrely through ovoiloble funds from

business ociivities under Lu Hong Stone Mining Compony Limited. The compony

is fully committed to finoncing the proposed Quorrying Proiecl, ot Mwochilingo /

Shontumbu Areo.



2.l6Employment ond lroinlng plon

The project is committed to the government policy of reducing poverty by

creolion of employment. As such lhe project wiil os much os possible moke use

of the locolly ovoiloble humon resource so os to contribute positlvely to job

creotlon resulting in poverty olleviotion ond improvement of locol economy. On

the job troining will be encouroged so os to reduce dependence on lobour

force from other oreos.



T



I



f



I



Lo,ge Scole Mlning tlce.ce (l,ML) Applicollon, Mwqchillngo / shontumbu Areo, (otue Dislrlcl. Lu Hong Slone Mining

Compony timited, Plol No.2440, Chlpwenupwenu Rood, Mokeni. P.O.Bor 33612, Lusokq.



27