NOTICE: The text below was created automatically and may contain errors and differences from the contract's original PDF file. Learn more here



At total of 1.53million tonnes at 1.8%f Cu is currently know and has been fully

evaluated. Mining will commence once the EIA has been approved.



I

t



6.0


EXPLORATION PROGRAM

Ruida investment Limited initiated geological exploration on the eastern side of

the old open pit at Jifumpa mine covered by the extended area of the mining

license (appendix 3).



T



As a result of this new exploration, an addition of 1.533 million tonnes of copper

ore reserves was discovered and added to the resource base. Plans are under

way to exploit this resource by open pit mining method once the EIA has been

approved by ZEMA. improved confidence level exploration is on-going. From the

current information, a numerical block modelling was generated as given in

Figure 7 below